PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing the hand set stone panels at the shear walls (South Elevation).jpg Leakage test at the 3rd floor Facing West.jpg Continued installing Elev. 1,2,3 car Facing West.jpg Continued laying out block at the 1st floor locker rooms Facing South.jpg Electrical wiring the 2nd floor VAV boxes Facing North.jpg
Next page Installing the hand set stone panels at the shear walls (South Elevation)
Installing the hand set stone panels at the shear walls (South Elevation)